Next-generation campus · Alupang
GU3
Tamuning, Guam
GU3 is GTA's Tier 3-designed data center and cable landing station built for the next generation of Pacific connectivity.
GU3 / Facility profile
- Purpose-built campus
- Bifrost landing station
- Diverse buried fiber
The next chapter in Pacific capacity.
Located at Alupang in Tamuning, GU3 connects through diverse buried routes to GU1, GU2, AT&T, and Tata cable landing facilities. Direct ocean bore pipes and available expansion paths position the campus for Bifrost and future subsea systems.
Built for Guam. Engineered for resilience.
GU3 is designed with typhoons, tsunamis, and earthquakes in mind. IT space is housed on the second floor, helping reduce exposure to ground-level flooding and adding another layer of physical resilience.
Facility
- 34,000 square feet of total facility space
- Approximately 16,000 square feet of data hall area
- Reinforced concrete construction with 14-foot minimum data hall ceiling
- Direct ocean bore-pipe access with future expansion capacity
Power & resilience
- 2N UPS redundancy
- 2N diesel generation
- N + 3 cooling redundancy
- On-site fuel for 14 days at full data center capacity
Security & protection
- Designed to Tier 3 data center compliance standards
- Category 5 typhoon-rated activity up to 190 mph
- Seismic Zone 4 compliance and elevated coastal siting
- Mantraps, strict access protocols, and video surveillance
Connectivity
- Bifrost cable landing station
- Diverse buried routes to GU1, GU2, AT&T, and Tata
- Carrier and service-provider cross-connects
- IP, peering, wavelength, and Ethernet services up to 100 Gbps
- Three diverse fiber routes into and out of the facility, reducing dependence on a single path